Plans & Permits
This primary phase involves working with Council and other Authorities to secure planning approvals and acceptance of documentation including engineering designs to allow physical works to commence on site.
 
Earthworks
Cut and fill is undertaken to bring the land in line with ultimate design levels.
 
Sewer & Drainage
Waste and storm water systems are constructed and connected to each lot.
 
Road Boxing, Curb & Channel
Here we see things really start to come together as the ground is prepared to lay down the lower layers of road pavement. Water and gas mains are also installed, and the kerb and channel (guttering system) is put into place.
 
Electrical & Communications
With kerb and channel works complete, in this phase trenches are dug for the running of electrical and telecommunications cabling and wiring, preparing the way for power, phones and the internet to be connected.
 
Footpaths & Asphalt
The ground goes through another round of preparation to enable the construction of footpaths, as well as for the topsoil of the community’s nature strips. Significantly, this phase also sees middle pavement layers constructed and roads take shape with the laying of asphalt.
 
Completion & Inspection of Works
Council and Service Authority perform final inspections before signing off on constructed works including roads and services. Final documentation is provided to Council, facilitating Statement of Compliance for the development stage.
 
Titles Office & Settlement
Each lot within the Stage is registered at the Titles Office, after which settlement can occur and you can start building your dream home.
 

Next steps

It’s time to contact your finance lender and conveyancing consultant to prepare for settlement, because all the construction work is complete, a Statement of Compliance has been issued and we have submitted your lot to the Lands Titles Office for registration (which generally takes between 2 and 4 weeks).

If you have any further questions, please don’t hesitate to contact our team in the Riverhills Sales Office.

Congratulations, and enjoy building your new home!